Well, I didn't really describe that well... basically I had to figure out how to adjust for my previous lack of planning, so it doesn't look too bad. The delay was worth it, though, as I figured out how to make everything work.
However, the delay also meant that we weren't done with the rearmost wall until after 8pm! The other wall still needs to have the window casing and trim stripped, then add the tarpaper and siding. Hopefully we can have all of that done in one day next weekend.Realizing that there is no time during the day that the sun isn't shining on the front of the house, we've also agreed that we're not going to bother with redoing the front wall of the second floor (the last one!) until the weather gets cooler. That means after we finish the second floor bumpout, it'll be time to move back inside. Next step in there, demolition of the area around the steps on the second floor. We're not planning on doing anything there at the moment, but since we can't effectively block it off from the first floor, we need to do that demo now, or deal with a finished first floor covered in plaster dust later!