Realizing that there is no time during the day that the sun isn't shining on the front of the house, we've also agreed that we're not going to bother with redoing the front wall of the second floor (the last one!) until the weather gets cooler. That means after we finish the second floor bumpout, it'll be time to move back inside. Next step in there, demolition of the area around the steps on the second floor. We're not planning on doing anything there at the moment, but since we can't effectively block it off from the first floor, we need to do that demo now, or deal with a finished first floor covered in plaster dust later!
Monday, September 1, 2008
Labor day labors
Realizing that there is no time during the day that the sun isn't shining on the front of the house, we've also agreed that we're not going to bother with redoing the front wall of the second floor (the last one!) until the weather gets cooler. That means after we finish the second floor bumpout, it'll be time to move back inside. Next step in there, demolition of the area around the steps on the second floor. We're not planning on doing anything there at the moment, but since we can't effectively block it off from the first floor, we need to do that demo now, or deal with a finished first floor covered in plaster dust later!
Saturday, August 30, 2008
Another full day of work...
We'll be celebrating this Labor Day weekend by living up to its name... laboring away! :)
Tuesday, August 19, 2008
Nothing new this weekend.
Tuesday, August 12, 2008
More pictures
Monday, August 11, 2008
Rain doesn't stop us, it just moves the activity.
Saturday was beautiful, and we got some good work done on the house. We moved on to the next section of wall, part of the bumpout outside the master bedroom. Thankfully, we don't need to reframe this window wither, so we were hoping to have the whole wall stripped, prepared, and siding reapplied by the end of the weekend, but several thunderstorms on Sunday kept that plan from being realized. We might not have been able to work where we wanted on Sunday, but that didn't stop us from working.
So, I set up a workbench on the front porch, and got out the infrared paint stripper, the scrapers, and the belt sander. I managed to strip many board feet of old siding, then sand it, then pass it through the window to Grace, who was priming the boards on all sides. This way, we both stayed busy and accomplishing important work on the house, even if we didn't get to do what we were planning. This will actually work out very well, since we'll be needing boards for the wall that we stripped.
It is so very nice to see the walls slowly transforming to the new color... I can't wait to see the whole house finally done, all one color!
Monday, August 4, 2008
Another wall is done
As usual, I took a bunch of pictures, but haven't done anything with them yet.
Friday, August 1, 2008
So much progress!
This past weekend was *very* productive. I took Friday and Monday as work-from-home days because we had contractors onsite to do some work. Friday, we had the heating folks in to pull our nasty old oil tank and install a nice, new one. The old tank was 270 gallons and standing on rusting legs. The new one is 230 gallons, and standing on shorter legs, so visually takes over the basement far less. We had discussed converting to a gas boiler, but when we had the heating folks out to maintain the boiler, they checked it and said it tested at 85% efficiency... which is very high for an oil boiler, so there wasn't as much reason to go to gas. We did, however, need to replace the tank.
Saturday and Sunday, we cleaned up the first floor in preparation for the spray foam insulation, and did even more demo, clearing plaster and drywall off of the walls on the stairs going up to the second floor. Although it's a dusty, nasty mess, it seemed to be not as bad as in the past, I guess I'm getting used to it. Don't know what I'll do when all of the old plaster and drywall is gone -- beyond be VERY, VERY HAPPY.
Monday, the spray foam folks showed up. Now, we had already insulated with fiberglass insulation, but in discussions with John Gemmi, decided to pull that down and go with spray foam. If you don't know, spray foam is a rigid foam, much like the stuff that comes out of a can of Great Stuff, which seals everything up and actually lends structural rigidity to the house. It doesn't compact like fiberglass can, all in all, aside from the price (2-4x fiberglass) it's really, really good stuff.
However, it's a bit messy to apply, so the first thing the contractors did was mask off the entire first floor and the stairs going to the second floor. Made the house look like it was the set of E.T. (who remembers that movie?) with everything covered in semi-clear plastic. Then, they sprayed the foam on the walls with a spray guy which mixed the two parts as it blew it on the wall. The foam then expands, and dries in a couple of minutes.
As for the siding, we removed all the siding from the second floor wall outside the guest room, and stripped the good pieces. The idea being, the original boards were never back primed, and this way, they were easier to strip and sand, and we can back prime and paint them, fully sealing them against the elements. A little more work in some ways, a little less in others, and ultimately it'll be a better job. However, we last worked on that before we went to San Diego three weeks ago. Maybe this week we'll get back to that and finish it up. After that, it's only the front of the second floor and the bumpout of the master bedroom which need attention, and we'll be effectively DONE with the repainting outside! We'll still have a patch on the office (that we don't see) and the third floor, but for now that'll be good enough.
Thursday, May 29, 2008
Back to painting...
It'll be a bit of work, just as always, but we've gotten pretty good at building window frames. Also, since 6 of the windows are on the second floor, and thus aren't as visible to the ground, we can use knotty red cedar for the casing. Down by the ground, we've opted to go with the clear red cedar, which carries a premium price... but without any knots, it gives a better appearance which holds up to direct inspection better.
Wednesday, May 28, 2008
It's always simpler when you know what you're doing.
Isn't it great how easy things can be when you know what you're doing?
Both Grace and I are very happy to work with John and his guys -- they're a great group and do the best work I've seen. That John is so willing to take a little time to stop by and help me figure out how to do some of my own work is just the icing on the cake!
Moved the electrical power supply
Well, we thought it was a brilliant idea, but we'd already had the work done, and figured it would be prohibitively expensive. I wasn't even going to pursue it any further, but Grace suggested we have Wes Carver stop by and give us a quote. Wes came out and looked it over, and although it wasn't tremendously cheap, it was definitely doable... so we decided to have it done.
Now that it's done, we're really happy with the results. Wes's guys did a great job with the conversion, mounting a main disconnect panel in the basement and running the power line back to the existing breaker panel... and the outside of the house now looks much cleaner. From our bedroom, we used to see a power line out of each of the three windows, with loops of supply cable right outside the center window. Now, that's all gone, moved out of sight, and it looks far better. Now, we can also properly fix the siding that had been obscured by the original power lines and meter.
A side effect is that the carraige house is now without power. At some point in the future, we'll be running a trench out to the carraige house to reconnect the water, waste, and electrical, but until then, the carraige house will just be a big shed. Not too much of a problem, but I will have to set something up so I can run an extension cord back there when I need power.
It would have been better to have moved the supply lines during the start of the Big Project, but oh well... I'm sure there will be other things we wind up re-doing as well. As long as the end result is good, we'll be happy.
At long last, back to working on the house
Wednesday, March 12, 2008
New location for the house blog.
I looked, and I can't migrate my old posts from my old blog so I'll keep the other one around, I'll just be doing updates here instead.
That said, I make no promises about making updates with any regularity.
Monday, July 9, 2007
Another fine scrape
The Outside projects gallery is updated with new pictures and comments, starting with the third picture on the second page!
Sunday, July 8, 2007
You gonna put scaffolding on that?
"You gonna put scaffolding on that?"
When we got around back to pick up the scaffolding, though, we were welcomed back, and all the guys who weren't doing anything at the time came out to watch as we stacked four pieces of scaffolding on top of the car, then put four 8 foot crossbraces in the hatchback. One guy who was helping us stood back as I finished lashing it all down with the ratcheting tiedowns, and said:
"You know, that actually works better on there than many pickup trucks we see."
12 years old, over 200,000 miles, and it's still a great little sport utility vehicle!
Thursday, July 5, 2007
Our Old New House is on the market again.
Anyhow, our old new (construction) house is back on the market after three years. Click on the picture to see the listing.
** The house sold, so the link to the listing no longer worked, so I changed it to go to a gallery of the pictures I grabbed from the listing.
The really funny part is several of the pictures look like they haven't done a THING to those rooms beyond move their stuff in. Guess they liked what we did! They did finish the master bedroom, the only room we hadn't redone before we left. That's a running joke between us - when we finish this house, except for the master bedroom, it'll be time to move again.
They did also finish the basement, and it looks like they did a good job. I had talked about doing that while we were there, but never got around to it.
Funny, though, both Grace and I said it brought back memories, but neither of us had any desire to go back. We like our new, old house. :)
First floor project on hold...
The reason for our pause on that project is we slated July and August as the time that we would pick up last year's project, namely repainting the house. We've started, breaking out the Silent Paint Remover and the scrapers. This weekend, we'll get scaffolding, but so far we've already done about 25% of the large wall we finished off with in November. Grace runs the heater, and I scrape. I've picked up a 6" variable speed grinder, so I can resharpen the scrapers at the end of each day, so they're good and sharp for the next day's work. I can even give them a quick resharpening when we break for lunch.
Only problem is the SPR is heating unevenly. I contacted the manufacturer, and they replied very quickly with some possible problems. I looked, and discovered we're still within the 1 year warranty - by exactly one week! So I think we'll be using it this weekend, returning it first thing Monday morning, and hoping for quick turnaround. We might have to find other stuff to do, but there are two windows on that wall (possibly three) which will need reframing, so we'll stay good and busy if we can't be scraping paint.
Wednesday, June 27, 2007
A little time off
On the house front, we're starting back up this weekend, but the First Floor project is going to be on hold for now. We still have to finish repainting the house like we started last year, and now is the time to get back to work on that. Hopefully, working together, Grace and I will make quick progress. Unlike the first floor project, stripping paint and repainting isn't rocket surgery, just takes some time and effort. I've learned how to resharpen the scrapers, too, so that'll help immensely.
Oh yeah! One more update on the house... we finally had a tile guy come in and tile the backsplash in the kitchen, and it looks GREAT. Have some pictures of that as well, just haven't posted them either.
Sunday, June 3, 2007
Fan guards are there for a reason...
Also, despite working (very carefully) inside the main circuit breaker panel to run new circuits, I managed to get a "tickle" from the fan motor when I reached to switch it off.
Like Dad taught me, "once you don't respect this, it'll kill ya". I guess I respect the circuit panel just a little bit more than this silly little fan. Both can still hurt, though, so be careful when you're working with stuff, even if it's not quite mortal danger.
This weekend, electrical work.
The quad box comes from our plan for the wiring. Two switches control lights in the kitchen, because there's no room for them by the kitchen doorway. Then, we have one switch for the chandelier over the dining room table, and one which will control the lights on the stairs to the second floor. The wiring for the kitchen circuits is already existing, since it was all redone during the The Big Project (which is starting to seem like not such a great name because our current first floor project is also pretty darn big) but I had to transfer it out of the nasty old metal box. The wiring for the dining room was all removed during demolition, so that's all new, and I'm also taking the opportunity to split the first floor into a 20-amp circuit for outlets and a separate 15 amp circuit for lights.
While we've got the ceiling off, I'm also going to redo the circuits for the second floor, and I got a start on that one, replacing fifteen feet of cable with 6 feet of new cable. For some reason, the old wire ran several feet out of the way, extending the length of cable needed. Very odd.
The nicest part is having a real light in the dining room area. It lights the area up far better than the 100W floor lamp we've been using.